Follow us :

prefabricated steel structure

prefabricated steel structure
prefabricated steel structureprefabricated steel structureprefabricated steel structureprefabricated steel structure
group name
Steel Structure Buildings
Min Order
500 square meter
brand name
ZYM steel structure building Manufacturer
model
ZYM1
Nearest port for product export
Qingdao, Shanghai, Guangdong
Delivery clauses under the trade mode
FOB, CFR, CIF
Acceptable payment methods
T/T, L/C, Westem Union
update time
Thu, 28 Dec 2023 00:45:17 GMT

Paramtents

  • Name Indonesia steel structure warehouse workshop

  • Key word Indonesia steel structure workshop with office

  • Design 3D max,CAD for steel structure frame

  • Material Q235,Q345B,SS400 steel structure

  • Foof Galvanized color sheet or sandwich panel

  • Wall Galvanized sheet for steel structure workshop

  • Place of project Indonesia steel structure workshop and warehouse

  • Delivery time 30 days after steel structure drawing confirmation

  • Package Steel structure frame pallet for 40HQ container

  • Application workshop,warehouse,office,commercial bulding,shop

Packging & Delivery

  • Min Order500 square meter

Briefing

Double layer steel structure building for workshop and warehouse with good design,fast installation,high quality.

Detailed

ZhengYuanming Construction Engineering Co., Ltd.. is a comprehensive building material manufacturer and provider focusing on steel structure construction. such ​as steel structure for building,steel frame building manufacturers,prefabricated structural workshop,astm steel structure workshop,house steel structure workshop,steel structure building example,high steel workshop,hot sale light steel structure warehouse etc .Since its establishment, the company has served more than 60 countries and regions in the world. Namibia, and Africa have our partners. Through high-quality products and sincere service, we are well received by customers. We also welcome and look forward to in-depth cooperation with more partners in the world in the future.ZYM has three modern base centers, one center is responsible for design and R&D, one center handles production ,one center is for the sales and service.The group maintains production facilities for high-quality prefabricated steel,steel structure with an annual output of 50,000-60,000 tons of steel structure.

Product name
prefabricated steel structure
Brand Name
ZYM
Model Number
STEEL - 01
Material
Color paint,Welded steel pipe,Wen steel plate: etc
Brand 
ZYM prefabricated steel structure Manufacturer
Tolerance
±1%
Keyword
large span real estate steel frame workshop,two story steel structure warehouse,Steel Structure Workshop in China,steel dome workshop,prefabricated steel structure workshop
Material
Q235,Q345B,SS400 steel structure
Delivery time
30 days after steel structure drawing confirmation
Certificate
PHI,TUV,BV,CE etc.
Package
Steel structure frame pallet for 40HQ container
Application
Light Steel Structure Warehouse Workshop,simple steel structure warehouse,prefabricated storage building,steel structure building
Processing Service
Bending, Welding, Decoiling, Cutting, Punching
FOB port
Qingdao Guangdong Shanghai
Terms of Payment
L/C, D/A, Western Union, T/T
FOB port
Qingdao Guangdong Shanghai
Processing Service
Bending, Welding, Cutting, Punching, Pre-assembling, Painting
Project Solution Capability
graphic design, 3D model design, total solution for projects
Main Materials
light steel construction
Color
Request, colorful
Design Style
Modern
Characteristics
Safe foundation, anti-seismic and windproof
Sales country
Falkland Islands,Marshall Islands,South Africa,Czech Republic,Algeria,Saint Vincent and the Grenadines

prefabricated steel structure For further information feel free to contact us

specially used for steel structure factory, color steel plate V840 and 950 color steel plate for warehouse

Project Name: prefabricated steel structureRecently, multiple steel structure projects undertaken by our company are steadily advancing and continuously making new progress.The company's project department and steel structure processing plant seize the golden period of construction and ensure the perfect performance of the project.prefabricated steel structure services FAQs GuideAre you looking for a quick review guide about prefabricated steel structureservices?An ultimate FAQ buying guide is available to help you.This guide contains all the information about all the important facts, figures, and various processes regarding prefabricated steel structure services.Let’s continue!

1.How do the construction time and labor costs for prefabricated steel structure compare to traditional building methods?
2.What is the maximum height that can be achieved with a ?
3.Can prefabricated steel structure be relocated or disassembled?
4.How does the construction time of a steel structure building compare to traditional methods?
5.What is the insulation and energy efficiency of prefabricated steel structure?
6.Can prefabricated steel structure be customized to fit specific design requirements?
7.What design options are available for the exterior aesthetics of a prefabricated steel structure?
8.What are the fire safety standards for prefabricated steel structure?
9.What are the most common applications for prefabricated steel structure?

1.How do the construction time and labor costs for prefabricated steel structure compare to traditional building methods?

Our prefabricated steel structure products undergo strict quality control to ensure customer satisfaction. Steel structure buildings typically require less time and labor costs than traditional building methods. Steel structures are typically pre-engineered and pre-fabricated, meaning that much of the work is done off-site in a factory setting. This reduces the amount of time and labor needed on-site, as well as the amount of waste generated. Additionally, steel structures are often easier to assemble than traditional building methods, which can further reduce labor costs.

2.What is the maximum height that can be achieved with a ?

We focus on providing high prefabricated steel structure quality products and services. The maximum height of a steel structure building is determined by the strength of the steel used, the design of the building, and local building codes. Generally, steel structures can reach heights of up to 30 stories or more.

3.Can prefabricated steel structure be relocated or disassembled?

We have advantages in marketing and channel expansion. Suppliers have established good cooperative relations, continuously improved workflows, improved efficiency and productivity, and provided customers with high -quality products and services. Yes, steel structure buildings can be relocated or disassembled. Steel structures are designed to be easily dismantled and reassembled, making them ideal for relocation. Steel structures can be disassembled and reassembled quickly and easily, making them a great option for businesses that need to move or expand.

4.How does the construction time of a steel structure building compare to traditional methods?

We adhere to the principle of quality first and have a complete production quality management system and quality inspection process. Steel structure buildings typically take less time to construct than traditional methods. Steel structures can be erected in a fraction of the time it takes to build a traditional building, often in as little as half the time. Steel structures are also more cost-effective, as they require fewer materials and labor to construct. Additionally, steel structures are more durable and require less maintenance over time.

How does the construction time of a steel structure building compare to traditional methods?

5.What is the insulation and energy efficiency of prefabricated steel structure?

We actively participate in the prefabricated steel structure industry associations and organization activities. The corporate social responsibility performed well, and the focus of brand building and promotion Steel structure buildings are highly energy efficient and can be insulated to meet the highest energy efficiency standards. Steel is a great conductor of heat, so it is important to use insulation to reduce heat transfer. Steel structure buildings can be insulated with a variety of materials, including fiberglass, cellulose, and spray foam. Steel structure buildings can also be designed to meet the highest energy efficiency standards, such as LEED certification.

6.Can prefabricated steel structure be customized to fit specific design requirements?

We have rich industry experience and professional knowledge, and have strong competitiveness in the market. Yes, steel structure buildings can be customized to fit specific design requirements. Steel structure buildings are highly customizable and can be designed to meet the exact needs of the customer. Steel structure buildings can be designed to fit any size, shape, or style, and can be customized with a variety of features such as windows, doors, insulation, and more.

7.What design options are available for the exterior aesthetics of a prefabricated steel structure?

We should have a stable supply chain and logistics capabilities, and provide customers with high -quality, low -priced prefabricated steel structure products. 1. Paint: Steel structures can be painted in a variety of colors to match the surrounding environment. 2. Siding: Steel structures can be clad in a variety of siding materials such as brick, stone, stucco, wood, or metal. 3. Windows and Doors: Steel structures can be fitted with a variety of windows and doors to match the desired aesthetic. 4. Roofing: Steel structures can be fitted with a variety of roofing materials such as metal, shingles, or tiles. 5. Lighting: Steel structures can be fitted with a variety of lighting fixtures to enhance the exterior aesthetic. 6. Awnings: Steel structures can be fitted with awnings to provide shade and protection from the elements.

8.What are the fire safety standards for prefabricated steel structure?

Our prefabricated steel structure products have competitive and differentiated advantages, and actively promote digital transformation and innovation. 1. Steel structures must be designed and constructed in accordance with the applicable building codes and standards. 2. Fire-resistant materials must be used in the construction of steel structures. 3. Fire-resistant coatings must be applied to steel structures to protect them from fire. 4. Fire-resistant insulation must be installed in steel structures to reduce the spread of fire. 5. Fire-resistant doors and windows must be installed in steel structures to prevent the spread of fire. 6. Fire-resistant sprinkler systems must be installed in steel structures to control the spread of fire. 7. Fire-resistant smoke detectors must be installed in steel structures to detect the presence of smoke. 8. Fire-resistant fire extinguishers must be installed in steel structures to extinguish fires.

What are the fire safety standards for prefabricated steel structure?

9.What are the most common applications for prefabricated steel structure?

We have a good reputation and image in the industry. The quality and price advantage of prefabricated steel structure products is an important factor in our hard overseas market. 1. Warehouses 2. Industrial Buildings 3. Agricultural Buildings 4. Retail Stores 5. Offices 6. Aircraft Hangars 7. Churches 8. Garages 9. Sports Facilities 10. Carports