Painting workshop
As the largest single factory building in the second phase of the project,
A total of 60000 square meters of exterior wall panels need to be erected,
Currently, 90% has been completed.|Prefabricated workshop
Except for the painting workshop,
There are also four steel structure buildings in the second phase of the project
External wall panels need to be erected.
Among them,
Exterior wall panels of structural workshop 3 and testing workshop
40% completion of laying,
Structural workshops 1 and 2
It is still in the stage of lifting steel columns and beams, as well as external wall panels,
20% completion of layin