Follow us :

China manufacture prefab steel structure large span warehouse workshop project in Indonesia Malaysia Thailand

China manufacture prefab steel structure large span warehouse workshop project in Indonesia Malaysia Thailand
China manufacture prefab steel structure large span warehouse workshop project in Indonesia Malaysia ThailandChina manufacture prefab steel structure large span warehouse workshop project in Indonesia Malaysia ThailandChina manufacture prefab steel structure large span warehouse workshop project in Indonesia Malaysia ThailandChina manufacture prefab steel structure large span warehouse workshop project in Indonesia Malaysia ThailandChina manufacture prefab steel structure large span warehouse workshop project in Indonesia Malaysia Thailand
FOB Price

US $30.0500 - 20000 square meter

group name
Steel Structure Workshop
Min Order
500 square meter
brand name
ZYM steel structure building Manufacturer
model
ZYM-01
Nearest port for product export
Qingdao, Shanghai, Guangdong
Delivery clauses under the trade mode
FOB, CFR, CIF
Acceptable payment methods
T/T, L/C, Westem Union
update time
Thu, 07 Dec 2023 15:23:06 GMT

Paramtents

  • Name steel structure large span warehouse workshop

  • Key word China steel warehouse workshop manufacture with CE

  • Material Q235,Q345B,SS400,H type hot rolled steel

  • roof of steel structure workshop Galvanized color sheet or sandwich panel

  • wall of steel structure workshop Galvanized color sheet or sandwich panel

  • steel structure workshop door and window Aluminium alloy and PVC

  • Application workshop,warehouse,office,hotel,commerical,school

  • Certification CE certification,ISO certification

  • delivery time 30 days after steel structure design confirmed

  • steel structure design softwaree CAD,3D3S,3DMX,TEKLA

Packging & Delivery

  • Min Order500 square meter

Briefing

The steel structure building has many features ,such as light weight, high strength and large span. short installation

Detailed

Project name: Jiangsu Hongqi Shipbuilding Heavy Steel structural engineering Workshop



Project category: structural engineering of heavy steel workshop project


Project location: Guannan County, Lianyungang City



Building area: 12000 square meters



Scope of engineering contracting: Production and installation of overall heavy steel structure engineering and enclosure



Jiangsu Hongqi Shipbuilding Co., Ltd. is located in Guannan County, Lianyungang City, and is known as the "Huangpu River in northern Jiangsu". It is located in the Jiangsu Guanhe Peninsula Port Industrial Zone Ship building Industrial Park on the north bank of the Guanhe River, covering an area of 44.6 hectares and utilizing the Guanhe River shoreline for 1000 meters. One 50000 ton shipyard, two 30000 ton shipways, one 580 meter outfitting dock, one steel pre-treatment steel structure workshop, and a series of other supporting facilities will also be built!

prefab steel structure
workshop prefab house
prefab workshop
prefab warehouse
Item name
Specification
Material Parameter
Technical Treatment
Column
H shape,Box,steel pipe,Hot rolled sheet
Q235B,Q345B
Paint or Hot dip galvanized
Beam
H shape,steel Truss,Hot rolled sheet
Q235B,Q345B
Paint or Hot dip galvanized
Bracing
Steel rod,Steel pipe,Angle steel
Q235B,Q345B
Purling
C or Z shape, purling Thickness:1.8mm~3.0mm
Q235B,Q346B
Hot dip galvanized
Wall and roof panel
EPS,Rock wool,Pu,Glass wool  Sandwich panel or Single sheet.
Steel T=0.426~0.8mm,insulation T=50~150mm
Alu-zinc 150g, Fluorocarbon paint
Door
Sliding or rolling door
Steel or Aluminum sheet,T=1.0~1.5mm
Paint or Hot dip galvanized
Window
alloy-Glass,Aluminium alloy-shutter
T=1.0~2.0mm
Alloy
Lighting panel
FRP, T=1.5mm or T=1.8mm
Coefficient of thermal expansion:2.2x10-5/cm/cm/℃
Light transmittance 85%
Ventilator
Turbine ventilator, and electric type
Steel,stainless steel,PC
Paint or Hot dip galvanized,304
Gutter
Galvanized or stainless steel plate
T=2.0mm
Hot dip galvanized,304
Downpipe
PVC pipe,Color steel pipe T=0.5mm
Φ110,160,200
Paint
Bolt
Ordinary, high strength
10.9S,4.8s
Hot dip galvanized
Anchor bolt
Steel rod M24,M27 M30
Q235B
                                  Steel columns                                              Steel Beams                                                   Tie bar 
                                    Knee Brace                                              Strutting  Piece                                           Casing  Tube
                                  C type purlin                                              Ztype Purlin                                                 Steel Sheet
                  Sandwich Panel                                                     Window                                                          Door 
                            Anchor Bolt                                      Strength Bolt                                            Natural  Ventilator
                                               We are different with full production system
Steel structure design is an important part of the whole steel structure construction. According to the Standard for Classification of Steel Structures,our steel building design is technologically advanced, economically,reasonable, safe and practical, and ensure quality.
2.EFFICIENT MANUFACTURE
Now we has 3 heavy steel production lines,2 light steel structure manufacturing lines. We has a complete production system of main steel structure,sub steel structure, purlin,structural accessories.
Strictly  Quality  Control 
In the process of designing, manufacturing and installing steel structures, we must insist the  most strictly sepcification of steel structure ,and make the procuct perfect .
Steel grade
GB/T 700-2006 Carbon Structural Steel Q235B(S235JR SS400 A36)
GB/T1591-2008 High Strength Low alloy 
Structural Steel Q345B(S355N,A50)
Profile
H beam GB/T11263-2010
Tube GB/T 6728-2002
Plate GB/T708.709
Angle GB/T706-2008
Fabrication&Finish
Fabrication GB50205-2001
HOT-galvanization GB/T13912-2002(ISO1461:1999)
3.FAST CONSTRUCTION
The steel structure building team has more than 20 senior project managers and registered construction engineers .The project manager responsibility system makes the steel structure perfect.
Size
11.8(L) * 2.13 (W) * 2.72 (H)
Weight
24T
Packaging Details
all of the steel structure columns and the beams ends will be packed by the blanket to protect them from the collision during the shipping in the container.
Size
11.8(L) * 2.13 (W) * 2.72 (H)
Weight
24T
Packaging Details
all of the purlin ends will be packed by the blanket to protect them from the collision during the shipping in the container.