Follow us :

2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop

2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop
2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop
group name
Steel Structure Workshop
Min Order
1 piece
brand name
ZYM steel structure building Manufacturer
Nearest port for product export
Qingdao, Shanghai, Guangdong
Delivery clauses under the trade mode
FOB, CFR, CIF
Acceptable payment methods
T/T, L/C, Westem Union
update time
Thu, 29 Dec 2022 19:18:18 GMT

Packging & Delivery

  • Min Order1 piece

Briefing

Metal structure workshop replace reinforced concrete with steel plates or sections, with higher strength.

Detailed

2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop

We design the internal structure and steel structure appearance,according to customer requirements and 

local environment. Steel structure design is in good agreement with the actual working performance of the 

steel structure.so the steel structural reliability is high.

The steel structure warehouse has strong wind resistance and can withstand hurricanes of 70 meters per 

second.Steel structure is insulated and refractory,so it is durable, the life of prefab building is above 70-100 years.

peb steel structure
steel structure detail

In the manufacturing process, we use the upper steel material , comes from JINAN AND RIZHAO STEEL plant 

group.The toughness of steel is good, making the structure more adaptable to dynamic loads.All steel 

components are prefabricated in the factory, assembled on site, with high precision and high degree of 

assembly.

The thermal insulation material used is mainly made of glass wool, which has good thermal insulation effect. 

With the insulation board of the outer wall, the "cold bridge" phenomenon of the wall is effectively avoided, 

and a better heat preservation effect is achieved. The thermal resistance of R15 insulation cotton with a 

thickness of about 100mm can be equivalent to a brick wall of 1m thick.

peb building
peb building materials

During the construction process, dry work is carried out to reduce the pollution caused by waste to the 

environment, and the steel structure material is 100% recycled.

The manufactured components are shipped to the site for installation. The steel structure construction time is 

shortened  to 30 days.


Read More 

ZYM After-Sale Service , we will still provide the service after the steel structure installation. 

For further information feel free to contact us