Follow us :

Tracking Of The Luxury Light Steel Villa(Ⅱ)Production

time2018/10/03

After the design of the prefab luxury villa , now it is the production of the prefab light steel and the delivery . We provide the customer one-stop service .
After the design of the prefab luxury villa , now it is the production of the prefab light steel and the delivery . We provide the customer one-stop service .

-PRODUCTION

light gauge steel prefabricated in factory:
Villa insulation system: OSB board,plastic board,glass wool, Waterproof breathable film,outside PU wall tile,inside Aluminum Pu tile

-Package&Delivery:

Materials ARRIVAL SITE:

Service is going on…